Temple Ford Design was appointed to carry out a technical exercise to improve the thermal performance of this Grade II Listed Barn.

In order to avoid disruption to the historic fabric as much as possible, insulation was provided to the underside of the thatch and between the existing rafters with an underlying layer of hessian. As part of Phase II, the existing plasterboard finish to the walls was removed to allow the installation of a breather membrane and insulation to help improve the remainder of the envelope, all of which resulted in a successful outcome.

WHAT

Remedial Work to The Hampshire Barn

WHERE

Winchester, Hampshire

WHEN

March 2016