LEISURE CENTRE REFURBISHMENT

Temple Ford Design was appointed to prepare drawings and information required for the Technical Design Stage of this project.

 

Primary works related to the complete refurbishment of the pool area and the associated changing village. New tiling, fittings and handrails were introduced to renovate poolside with the finishes to the walls and ceiling updated. A new flume was installed above the pool itself along with water play equipment in the shallow section. 

 

As part of these works the changing village was also completely refurbished to modernise and rationalise the space. New finishes throughout were introduced as well as new lockers, cubicles and floor drainage.

WHAT

Leisure Centre Refurbishment

WHERE

Malvern, Worcestershire

WHEN

April 2019

CONTRACTOR